LODE FOR MEP & BUILDING SERVICES

MEP contractor software
for building services changes.

For a mechanical, electrical and plumbing business, Lode prices drawing changes, chases unanswered site queries and rebooks visits when equipment is late. Someone on your team approves each one before it goes out.

30 minutes. Sample data. No account needed.

Marker sketch of ductwork, pipes and cable tray sharing a structural opening above a revised coordination drawing.
A coordination drawing has been revised.The affected services and next steps are visible.
Built around your kind of workClear detail behind the resultYour team keeps the final say

01 / THE FAMILIAR LOOSE ENDS

One change.
Several trades to bring with it.

01

One revision touches three trades.

A moved service route changes the work for more than the person who received the drawing.

02

Instructions are scattered.

The answer sits across drawings, messages and meeting notes.

03

The commercial impact is late.

The work moves ahead before the variation has been gathered and checked.

Building-services installer tightening a pipe support in a commercial plant room, with ductwork and cable tray nearby.
MEP & BUILDING SERVICESDETAIL THAT FITS

02 / OUT ON THE JOB

The detail has
to work on site.

Pipework, ductwork and cables share a limited space. Your team makes them fit. Lode helps keep the latest instruction, design questions and cost changes together, ready to check.

DRAWING REVISED
Instruction & affected trades
SITE QUERY RAISED
Open questions & owner
CHANGE AGREED
Scope, cost & programme

03 / SEE THE WORK COME TOGETHER

A duct route moves. The right people need to know.

IT STARTS WITH A MESSAGE
“The coordinated drawing now moves the main duct through Zone C. Please identify the affected services and confirm the programme impact.”

A typical situation for MEP and building-services contractors. The original instruction stays attached to the prepared work.

Prepared by LodeDRAFT

Coordination-change review

  • Attach the revised drawing and original instruction.
  • Bring together the affected mechanical, electrical and plumbing work.
  • Prepare a scope and programme response for the responsible team.
Walk through a job like this

Fictional example. Your team reviews the work before anything is sent, booked or issued.

04 / A FEW PRACTICAL QUESTIONS

Start with the work you know.

Can we start with a site query or revised drawing?

Yes. The walkthrough can follow a sample drawing revision or site query through the affected trades, outstanding questions and proposed response. Your project team checks the technical detail and decides what happens next.

Will it replace the people coordinating the design?

No. Your designers and project team keep responsibility for coordination and technical decisions. Lode helps organise the supporting context and prepare the work they need to review.

What happens in the walkthrough?

We spend 30 minutes on a sample job relevant to MEP and building-services contractors: the instruction, the knock-on work and the result your team would review. No account or system connection is needed.

Who decides what gets sent or changed?

Your team keeps the final say. The examples show prepared work that you can review, amend or send back before it is issued.

05 / IN MORE DETAIL

MEP contractor software: drawing revisions, RFIs and variations

For a mechanical, electrical and plumbing business, Lode prices drawing changes, chases unanswered site queries and rebooks visits when equipment is late. Someone on your team approves each one before it goes out. That applies across mechanical, electrical and plumbing packages.

Building services admin: a revised ceiling layout across mechanical, electrical and plumbing

Before. The architect issues a revised ceiling plan late on a Friday. Ductwork routes and containment both move. The site team spots it on Monday and builds to the new layout. The estimator hears three weeks later. By then the labor is spent, and the main contractor asks why the variation is late.

With Lode. Lode compares the new revision with the one your quote was priced on. It drafts the variation with the added lengths and labor, taken from your own rates. The programme effect is stated, and both drawings sit beside the draft. Your contracts manager checks the quantities and approves the notice.

Admin that falls through in MEP firms

1. RFIs with no answer and no owner. A query about a riser clash goes to the design team and waits. Work continues around it. Lode keeps the RFI, its date and the affected drawing beside the job and drafts the reminder. The RFI and submittal tracking guide sets out a simple log.

2. Submittals approved after the lead time has gone. Plant with a long lead time needs approval early. A submittal waiting in a consultant's inbox quietly moves the delivery. Lode drafts the update to the main contractor and shows which install dates depend on that approval.

3. Coordination changes absorbed as goodwill. Another trade's steel or drainage forces your pipework to reroute. The fix happens on site, unpriced. Lode drafts the variation from the site message and the marked-up drawing.

The records behind the decision

Lode works from the documents already in your business: drawing registers, quotes, RFIs, submittals, supplier orders, emails and the programme. Every draft cites the revision and message it came from. You keep your estimating and job software. Which records Lode works with, and who approves, is agreed before anything is connected.

BETTER BACKUP FOR MEP & BUILDING SERVICES

Less to chase.
More to get on with.

Bring the kind of job that keeps spilling into your evening.
We’ll show you where Lode fits.

Book a walkthrough30 minutes · Sample data · No account needed